BIM and Level of model information (LOI) and Level of Development (LOD)

Building Information Modeling (BIM) is a digital process that involves creating and managing building data throughout its lifecycle. BIM is used for a variety of purposes, including design, construction, and maintenance, and allows for collaboration and communication between different stakeholders. BIM can be used for mechanical, electrical, and public health (MEP) services, which include the design and installation of heating, ventilation, air conditioning, lighting, power, plumbing, and fire protection systems. BIM provides a framework for organizing and managing MEP data, and can be used to create different levels of model information (LOI) depending on the project’s requirements.

LOI refers to the level of detail and information included in a BIM model. There are different levels of LOI, ranging from basic to highly detailed, depending on the project’s stage and requirements. The five levels of LOI are:

Level of Development (LOD) 100

Level of Development LOD 100: This level represents a basic model with limited detail and information. It is typically used for conceptual design and visualization purposes and may include basic geometry and spatial relationships.

Level of Development (LOD) 200

Level of Development LOD 200: This level represents a more detailed model that includes information about MEP systems’ rough sizing, layout, and performance. It is typically used for design development and coordination purposes and may include information about equipment, materials, and specifications.

Level of Development (LOD) 300

Level of Development LOD 300: This level represents a highly detailed model that includes information about MEP systems’ exact sizing, layout, and performance. It is typically used for construction documentation and coordination purposes and may include detailed specifications, fabrication details, and installation instructions.

Level of Development (LOD) 400

Level of Development LOD 400: This level represents a model with detailed information about the MEP systems’ installation and fabrication. It is typically used for construction and fabrication purposes and may include information about shop drawings, fabrication details, and installation sequences.

Level of Development (LOD) 500

Level of Development LOD 500: This level represents a model with asset data about the MEP systems’ operation and maintenance. It is typically used for operations and maintenance purposes and may include information about equipment schedules, maintenance requirements, and performance data.

———————————

Examples of how BIM and LOI can be used for MEP services include (5 stages of LOD):

LOD 100 (conceptual design) can be used for creating simple models of MEP systems for visualization purposes. The model consists of 2D symbols and masses to signify the existence of an element.
LOD 200 (schematic design) can be used for creating more detailed 3D models of MEP systems for design development and coordination purposes. A representation of a partially defined idea of elements’ size, location in the facility etc. but with much rough approximation
LOD 300 (modelled as design-specified) can be used for creating highly detailed 3D models of MEP systems for construction documentation and coordination purposes.
LOD 400 (supplementary components added) can be used for creating detailed 3D models of MEP systems for fabrication and installation purposes.
LOD 500 (final design) can be used for creating asset information models for management and maintenance purposes, including equipment schedules, maintenance requirements, and performance data.

In conclusion, BIM and LOI provide a powerful framework for organizing and managing MEP data throughout the building lifecycle. By creating detailed models of MEP systems, stakeholders can improve coordination, communication, and collaboration, resulting in more efficient and effective projects. Building owners and managers should work with experienced MEP contractors and MEP BIM experts to ensure that their projects are designed and built to the highest standards of quality and efficiency.