Scroll to top
© 2023, Design by projekty HVAC
Share

HVAC design


Category

Should you invest in a project for Underfloor Heating (UFH)?

When it comes to heating systems for your home or commercial space, underfloor heating...

admin 2024-03-07
BIM and Level of model information (LOI) and Level of Development (LOD)

BIM and Level of model information (LOI) and Level of Development (LOD)

Building Information Modeling (BIM) is a digital process that involves creating and managing building...

admin 2023-04-29
What is a smart HVAC?

What is a smart HVAC?

HVAC stands for Heating, Ventilation, and Air Conditioning, and it is an essential component...

admin 2023-04-25
HVAC design - REMARS

HVAC design - REMARS

HVAC (Heating, Ventilation, and Air Conditioning) design is the process of creating a system...

admin 2023-04-02
Require Ventilation design?

Require Ventilation design?

Ventilation design (mechanical, electrical, public health and plumbing) REMARS M&E Consulting Engineers offer a...

admin 2021-06-10
Require MEP design?

Require MEP design?

MEP design (mechanical, electrical, public health and plumbing) REMARS M&E Consulting Engineers offer a...

admin 2021-06-05
ECDC: HVAC systems in the context of COVID-19: 1st update (10th Nov 2020)

ECDC: HVAC systems in the context of COVID-19: 1st update (10th Nov 2020)

ECDC COVID-19 guidance This document aims to provide guidance for public health authorities in...

admin 2020-12-04
Conversion the Operating Theatres into neutral (from positive) or / and to negative pressure rooms

Conversion the Operating Theatres into neutral (from positive) or / and to negative pressure rooms

One of the projects for hospital from recent days is: Due to Covid-19, of...

admin 2020-04-08
Building services

Building services

The Importance of Using a Professional Building Engineer Are you about to embark on...

admin 2019-06-21
Ventilation Forum - Air Conditioning Showroom (Warsaw - Poland) 2019

Ventilation Forum - Air Conditioning Showroom (Warsaw - Poland) 2019

17th International Fair and Conference Ventilation Forum - Air Conditioning Showroom (Warsaw - Poland)...

admin 2019-03-08
The foundation in the design is knowledge and experience - CIBSE - ASHRAE

The foundation in the design is knowledge and experience - CIBSE - ASHRAE

CIBSE, ASHRAE - The foundation in the design is knowledge and experience. To carry...

admin 2018-12-12
Insulation thicknesses - pipework, ductwork

Insulation thicknesses - pipework, ductwork

THICKNESS BASED ON BS5422 TABLES 12 & 13 NOMINAL PIPE SIZE (mm) MINERAL WOOL...

admin 2018-08-31
Design Parameters - velocity, pressure losses - pipework, ductwork

Design Parameters - velocity, pressure losses - pipework, ductwork

The following data provides the designer with general values for Component Design Parameters -...

admin 2018-08-16
Ventilation Rates

Ventilation Rates

The following data provides the designer with general values for ventilation rates (since introduction...

admin 2018-08-14
Heating Cooling Loads

Heating Cooling Loads

The following data provides the designer with general values for assessing heating and cooling...

admin 2018-08-10